Pacific Gas and Electric

PG&E serves roughly 5.4 million electric customers across northern and central California. The utility offers two EV-specific time-of-use rate plans (EV2-A for single-meter homes and EV-B for dedicated second meters), a residential Level 2 charger rebate of up to 50 percent of purchase price, with an income-qualified Rebate Plus tier paying up to $2,000 for charger installation or up to $5,000 when bundled with a panel upgrade, and an EV Power Ready make-ready program for new non-residential charging service. The Empower EV program closed to new applicants on December 31, 2024. PG&E's EV Fleet Program, its Multifamily Housing and Small Business EV Charger Program, and its EV Charge Manager managed-charging program with WeaveGrid are all currently fully subscribed and not accepting new applications.

At a glance

Investor-owned
Serves
California
Customers
5,400,000
EV rate plan
Yes
EVSE rebate
Yes
Managed-charging program
Yes

EV time-of-use rate plans

EV2-A

Verified Aug 2026

Peak
4pm to 9pm every day
Varies
Off-peak
12am to 3pm every day; partial peak 3pm to 4pm and 9pm to 12am
Varies

Residential customers with a registered EV or PHEV on a single whole-house meter. Non-tiered time-of-use rate.

EV-B

Verified Aug 2026

Peak
2pm to 9pm Monday through Friday; 3pm to 7pm Saturday, Sunday, and holidays
Varies
Off-peak
All hours outside the peak and partial-peak windows. Partial-peak is 7am to 2pm and 9pm to 11pm Monday through Friday (except holidays).
Varies

Residential customers with a dedicated second meter wired to the EV charger. Not eligible for CARE, FERA, or Medical Baseline discounts. Households over 800 percent of baseline allowance in the prior 12 months are not eligible. EV-B has its own weekday/weekend peak schedule and is not the same schedule as EV2-A.

Residential EVSE rebates

Residential EV Charging Rebate

Standard rebate: up to 50 percent of the purchase price of a qualifying Level 2 charger. Rebate Plus (income-qualified): up to $2,000 for installation of an eligible charger, or up to $5,000 when bundled with a panel upgrade.

PG&E residential customers installing a qualifying Level 2 charger from PG&E's pre-approved equipment list, installed by a licensed California electrician, on a first-come, first-served basis. Applications accepted within 180 days of equipment purchase. Rebate Plus requires household income below 80 percent of Area Median Income for the customer's county and household size, or enrollment in a qualifying public assistance program. The program is funded through California's Low Carbon Fuel Standard program rather than customer rates.

Apply / learn more →

Empower EV Program (closed to new applicants)

While active, offered a free Level 2 charger (valued at $500) plus up to $2,000 in panel upgrade funding per single-family home. The program closed to new applicants on December 31, 2024, and PG&E now directs interested customers to the Residential EV Charging Rebate instead.

Not currently accepting applications. While active, eligibility required PG&E residential customers in single-family homes with household income at or below 400 percent of the federal poverty level, income verified by GRID Alternatives, with panel upgrades performed by Synergy Companies.

Apply / learn more →

Commercial & multifamily rebates

Multifamily Housing and Small Business EV Charger Program (EV Charge 2) (fully subscribed)

No cost charger and installation for sites in priority communities, including two years of networking and software fees, while the program was accepting applications. The program has reached full subscription and is no longer accepting applications.

Not currently accepting applications. While open, eligibility covered multifamily properties with 5 to 49 units, or deed-restricted affordable multifamily of any size, and small businesses with 100 or fewer employees and average annual gross receipts of $16 million or less. Sites in PG&E-designated priority communities qualified for fully covered installation.

Apply / learn more →

EV Fleet Program (fully subscribed)

While accepting applications, offered make-ready infrastructure plus a charger rebate of 50 percent of cost, capped at $15,000 (up to 50 kW), $25,000 (50.1 to 149.9 kW), and $42,000 (150 kW and above) per port. The program is fully subscribed and is no longer accepting applications.

Not currently accepting applications. PG&E's EV Fleet Advisory Services remain available to help with fleet electrification planning regardless of enrollment status.

Apply / learn more →

EV Power Ready Program

End-to-end design, installation, and maintenance of the electrical service between PG&E's distribution system and the customer meter panel for separately metered EV charging. Requires a $3,500 engineering advance, credited toward the total project cost.

Non-residential customers building new, separate, dedicated service for EV charging stations, committing to operate the charging station for at least five years. Single-family residences are not eligible. Customer is responsible for purchasing and installing the chargers.

Apply / learn more →

Managed-charging programs

EV Charge Manager (with WeaveGrid) (fully subscribed)

WeaveGrid software automatically schedules a driver's home charging during the lowest-cost, lowest-demand hours to hit a target battery level by their ready-by time. Driver plugs in nightly and the program handles the rest. The program is fully subscribed and is not currently accepting new enrollments.

While accepting new enrollments, was free for qualified drivers with a $75 Tango gift card after remaining enrolled and connected to WeaveGrid for at least three months, plus a participation incentive set at enrollment.

PG&E offers two EV-specific time-of-use rate plans with different schedules. EV2-A, the single-meter option most residential EV owners use, has a 4pm to 9pm peak window every day, all year, with the lowest rates from midnight to 3pm. EV-B, which requires a dedicated second meter wired to the charger, runs a wider weekday peak of 2pm to 9pm and a shorter weekend and holiday peak of 3pm to 7pm; its off-peak and partial-peak hours also differ from EV2-A's. Customers should confirm which schedule applies to their plan rather than assuming the two rates share one set of hours.

The residential Level 2 charger rebate pays up to 50 percent of the charger's purchase price, with a Rebate Plus tier for income-qualified customers (households below 80 percent of Area Median Income) paying up to $2,000 for installation or up to $5,000 when bundled with a panel upgrade. The separate Empower EV program, which bundled a free charger with panel-upgrade funding, closed to new applicants on December 31, 2024. On the commercial side, PG&E's EV Fleet Program, its Multifamily Housing and Small Business EV Charger Program, and its EV Charge Manager managed-charging program with WeaveGrid (which paid a $75 Tango gift card on enrollment) are all currently fully subscribed and not accepting new applications; the EV Power Ready make-ready program for new non-residential charging service remains open.

PG&E's northern and central California footprint spans wildfire-prone foothills where Public Safety Power Shutoffs can interrupt charging during high-risk weather. Customers planning long overnight charging windows should keep at least one fallback option (a public DC fast charger or workplace Level 2) outside the shutoff zones. The territory's high baseline residential electric rates also make overnight TOU shifting unusually valuable compared to flatter-rate regions.

Service territory

California

  • Alameda
  • Contra Costa
  • Marin
  • San Francisco
  • San Mateo
  • Santa Clara
  • Sonoma

Free guide

The Home EV Charging Guide

Everything a homeowner needs to go from curious to charging. Chargers, installation, costs, and the credits that pay for it. No sales pitch.

  • Do you actually need Level 2?
  • What installation really involves
  • Costs, credits, and incentives
  • Your install-day checklist
Get the free guide

Free, just your email address.

Free guide

The Commercial Charging Playbook

A practical guide to deploying commercial EV charging that pays for itself. Planning, utility coordination, funding, and the real business case. No vendor spin.

  • Should your property offer charging?
  • Planning and the deployment process
  • Funding: NEVI, CFI, and state and utility programs
  • ROI and the business case
Get the free guide

Free, just your email address.

The Weekly EV Charging Briefing

One email a week. Just EV news that matters.

By subscribing you agree to our Privacy Policy. Unsubscribe any time.