On September 9, 2026, EVgo and Regency Centers announced more than 400 new fast-charging stalls at grocery-anchored shopping centers, up to 24 chargers per new site. The pitch is dwell time: a grocery trip averages about 23 minutes, close to a fast-charge session. A 2026 industry study found fast chargers near grocery stores run nearly five times the dataset median of sessions per day. But the deal terms are private, the format is built for large centers, and a grocery anchor does not make Level 2 charging work. Here is how to tell whether your center is the kind this model wants.
Updated Oct 20267 min read
Every major fuel retailer is adding DC fast charging in 2026 as gasoline revenue erodes, but the case is not identical to a general retail install. Convenience stores are a strong DCFC fit and a poor Level 2 fit, the grid capacity and per-port cost are the real constraints, and the in-store revenue lift numbers circulating from early movers deserve more scrutiny than vendor pitches give them.
Updated Oct 202611 min read
The case for EV charging depends heavily on property type. Multifamily housing has the clearest retention case: residents who cannot charge at home choose buildings that let them. Workplace charging is a high-value, low-cost benefit. Retail and hospitality live or die on dwell time. Fleets have the cleanest math. And some property types are a poor fit no matter how the incentives line up.
Updated Oct 202611 min read
Readiness is not a single yes or no. It is a combination of demand signals (tenant requests, local EV adoption, competitor moves), fit signals (dwell time, parking control), and feasibility signals (electrical headroom, incentive availability). When demand and feasibility line up, the timing is right. When they do not, waiting is often the honest answer.
Updated Oct 20268 min read
EV charging does not pencil out for every property right now. Negligible EV demand among your users, electrical service that needs a costly upgrade, very short dwell times, no available incentives, and short hold periods can all make the case weak. For many properties the honest answer is wait two to three years; for a few it is genuinely not a fit; and there is a low-cost hedge in between.
Updated Oct 20269 min read