Louisville Gas and Electric Company
Louisville Gas and Electric Company (LG&E), a PPL Corporation subsidiary, serves about 443,000 electric customers across the Louisville metro area and surrounding Kentucky counties as an investor-owned utility regulated by the Kentucky Public Service Commission. LG&E offers a voluntary residential Time-of-Day Energy rate (RTOD-Energy) with peak windows that shift by season, weekday mornings and evenings in winter and weekday afternoons in summer, and runs the Optimized EV Charging managed-charging program that pays residential customers $25 at enrollment plus $5 per month. LG&E does not offer a standalone rebate for buying or installing a home Level 2 charger.
At a glance
Investor-owned- Serves
- Kentucky
- Customers
- 443,000
- EV rate plan
- Yes
- EVSE rebate
- –
- Managed-charging program
- Yes
EV time-of-use rate plans
Residential Time-of-Day Energy Service (RTOD-Energy)
Verified Sep 2026
- Peak
- Five seasonal periods, not two. Winter (January through the 2nd Saturday in March, and the 1st Sunday in November through December): weekdays 6am-10am and 6pm-10pm EST. Spring transition (2nd Sunday in March through March 31) and fall transition (November 1 through the 1st Saturday in November): weekdays 7am-11am and 7pm-11pm EDT, a shifted double peak, not the summer single-peak window. Summer (April through October): weekdays 2pm-6pm EDT only.
- 19.2¢/kWh
- Off-peak
- All other weekday hours plus all weekend hours, year-round (Eastern Time)
- 9.2¢/kWh
Voluntary opt-in rate for LG&E residential customers on standard Rate RS; limited to 500 participants combined across LG&E and KU, first-come first-served. Current rates set in Kentucky PSC Case No. 2025-00114, effective January 1, 2026.
Managed-charging programs
Optimized EV Charging
LG&E residential customers enroll a qualifying Wi-Fi-connected Level 2 smart charger or compatible EV and let the utility optimize the daily charging schedule. The utility may invoke a limited number of demand response events per year; customers can override the optimized schedule at any time.
$25 one-time enrollment incentive plus $5 per month
LG&E's voluntary residential Time-of-Day Energy rate, called RTOD-Energy, is the main tool for EV owners who want to cut charging costs. It is an opt-in alternative to the standard residential Rate RS. On-peak hours change across five seasonal periods, not two: winter (January through the 2nd Saturday in March, and the 1st Sunday in November through December) runs weekdays 6 am to 10 am and 6 pm to 10 pm; the spring and fall DST-transition weeks (2nd Sunday in March through March 31, and November 1 through the 1st Saturday in November) shift to weekdays 7 am to 11 am and 7 pm to 11 pm; and summer proper (April through October) narrows to a single weekday window of 2 pm to 6 pm. All weekend hours are off-peak year-round. Charging an EV overnight, or midday during the summer season, lands in the off-peak window, which is the point of the rate. The program is capped at 500 participants combined across LG&E and KU, accepted first-come, first-served, and is best suited to drivers who can shift most charging out of whichever peak window applies for the current season.
LG&E does not pay a rebate for purchasing or installing a home Level 2 charger; its residential ENERGY STAR rebates cover HVAC equipment, not EV chargers. The EV-specific incentive is the Optimized EV Charging managed-charging program, which pays $25 at enrollment and $5 per month to residential customers who let the utility optimize charging through a qualifying Level 2 smart charger or compatible EV. The RTOD-Energy rate and the Optimized EV Charging program can be used independently. LG&E's commercial EV offering is a turnkey hosting arrangement where the business pays installation and monthly hosting fees, not a rebate.
LG&E is an integrated investor-owned utility in a traditionally regulated state; the Kentucky PSC sets its rates through contested rate cases rather than through a competitive retail market. LG&E and its sibling utility KU share the lge-ku.com site and nearly identical program designs, but they file separately: LG&E's current rates come from PSC Case No. 2025-00114, settled in February 2026 and effective January 1, 2026. LG&E serves the Louisville metro and nearby counties, while KU serves other parts of Kentucky.
Service territory
Kentucky
- Bullitt
- Hardin
- Henry
- Jefferson
- Meade
- Oldham
- Shelby
- Spencer
- Trimble
Cost to charge
Other utilities in Kentucky
State guides
Sources
- LG&E and KU residential time-of-day ratesRetrieved Sep 2026
- LG&E and KU EV charging programs hubRetrieved Sep 2026
- GreaterGrid LG&E and KU Optimized EV Charging enrollment (formerly ChargingRewards)Retrieved Sep 2026
- LG&E and KU About page (customer counts)Retrieved Sep 2026
- Kentucky PSC Case 2025-00114 LG&E customer notice of rate adjustmentRetrieved Jun 2026
- DSIRE listing: Louisville Gas and Electric and Kentucky UtilitiesRetrieved Jun 2026
Federal and state-level program details are tracked at DSIRE.
Free guide
The Home EV Charging Guide
Everything a homeowner needs to go from curious to charging. Chargers, installation, costs, and the credits that pay for it. No sales pitch.
- Do you actually need Level 2?
- What installation really involves
- Costs, credits, and incentives
- Your install-day checklist
Free, just your email address.
Free guide
The Commercial Charging Playbook
A practical guide to deploying commercial EV charging that pays for itself. Planning, utility coordination, funding, and the real business case. No vendor spin.
- Should your property offer charging?
- Planning and the deployment process
- Funding: NEVI, CFI, and state and utility programs
- ROI and the business case
Free, just your email address.
The Weekly EV Charging Briefing
One email a week. Just EV news that matters.
By subscribing you agree to our Privacy Policy. Unsubscribe any time.