The best hotel EV charging revenue figure we could find is about $3,300 a year per site. That is the average paid-charging income across 78 hotel properties on one vendor's network, and the top tenth of those sites earned nearly $11,000. Meanwhile, the guest surveys behind the "you need chargers to compete" pitch run from 19 percent to 91 percent depending on who paid for the survey. Both sets of numbers deserve a hard look before a hotel signs a charger contract.
Our short version: charging is a reasonable hotel amenity, a poor hotel profit center, and a decision that lives or dies on room nights, not kilowatt-hours. For how hotels compare with offices, retail, and multifamily, see which property types are best suited for EV charging. This article goes one level deeper on hospitality.
What guests say versus what guests do
Several surveys get repeated in hotel charging sales material. They do not agree, and the gap tells you something.
- J.D. Power, 2023: In its North America third-party hotel management guest satisfaction benchmark (3,942 branded-hotel responses, May 2022 to May 2023), 19 percent of guests said they need an EV charging station at their hotel, but only 6 percent said they had actually used hotel-provided EV charging. J.D. Power also placed charging behind Wi-Fi and USB ports as a technology priority.
- Boutique and Luxury Lodging Association and El-Monde, April 2025: A survey of 300 EV drivers, commissioned by the association and a charging company and run by BrandAgent Research, found that about 91 percent were more likely to stay somewhere with charging. Roughly three in four said they would pay a premium room rate for it, and 80 percent said they would travel farther for EV-friendly lodging.
- Other vendor-linked figures: A UK study cited by a charging vendor put the "charging affects my booking" share near 80 percent, and another vendor-cited study put it at 67 percent. We could not trace either to a primary release, so we do not rely on them.
Read these as three different questions. J.D. Power asked all hotel guests, most of whom do not drive an EV, and found a minority need charging and a smaller minority use it. The BLLA survey asked only EV drivers, through a sponsor with a stake in the answer, and asked what they would prefer, not what they booked. Stated preference runs ahead of behavior in nearly every amenity survey; people say they would pay a premium far more often than they do.
In short: among EV drivers, charging is a real tiebreaker, especially on road trips. Among your whole guest base today, the people who will plug in on a given night are a small share. How small depends on your market and your guest mix, which is why you should measure before you size the project.
What it earns: the revenue benchmark
EV Connect, a charging software vendor, published a benchmark of 12 months of data from 78 hotel properties on its network. It reported average annual income from paid charging of $3,274 per site, with the top 10 percent earning nearly $11,000. An older version of the same benchmark covered 22 months at 68 properties and reported roughly $4,000 on average, with the top 10 percent above $10,000; we could not confirm whether those were annual or cumulative figures, so we do not compare them with the 12-month number. We could reach only secondary reprints of these reports, not the originals, so we cannot tell you whether the dollar figure is gross revenue or net of electricity, or which model year of hardware and pricing it reflects. Treat it as one vendor's network, not the hotel industry.
Even so, the order of magnitude is useful. Put it against a project cost to see what it means:
- Our realistic ROI model assumes about $7,500 gross installed cost per Level 2 port. Two ports is therefore about $15,000 (an illustrative planning figure, not a quote).
- At the $3,274 average, that is a simple payback of roughly 4.6 years if the benchmark is net income, and longer if it is gross revenue before power, network, and maintenance costs.
- The benchmark does not report ports per site, so these two-port paybacks are order-of-magnitude illustrations, not predictions.
- At the top-decile figure of about $11,000, the same two ports pay back in under 1.5 years. Few sites get there.
Compare that with the 8-port highway-corridor hotel in the same ROI article. It reaches a 5.7-year payback only by assuming 18 kWh per port per day and $0.40 per kWh, while measured Level 2 venue averages run 5.8 to 10.6 kWh per port-day (NREL EV WATTS data). At 3 percent active-charging occupancy, the typical case today, that site's payback stretches to 33.6 years. Eight ports is a bet on a busy corridor; two to four ports is a bet on your own guests.
Where room nights come in
If the electricity revenue is modest, the case for the amenity is bookings. Two mechanisms matter, and both are assumptions you should write down rather than hope for:
- Capture: an EV-driving guest who would have skipped your property books it because charging is listed, including on trip-planning apps such as PlugShare and A Better Routeplanner.
- Retention and rate: guests who found reliable charging return on later trips, and some will accept a higher rate.
A usable test is a break-even count. Take the annual cost of the program (net capital spread over its life, plus network fees and maintenance, minus charging margin) and divide by what one extra room night contributes after variable costs. If your program costs $4,000 a year net and an incremental room night contributes $100 after housekeeping and distribution costs (both figures are placeholders, so use your own), you need 40 extra room nights a year for the amenity to break even. That is a number you can sanity-check against your booking data and your own EV-driver count. It is a much better question than whether a survey says 91 percent.
The evidence for the booking effect is thin. Our tenant retention and customer behavior article collects what operators report, and it is mostly operator surveys and case studies, not matched comparisons. Model the effect conservatively.
Sizing and siting for overnight stays
Hotels have the most favorable dwell pattern in commercial charging. A guest parks for 8 to 12 hours, which is long enough for a standard Level 2 port to deliver most of what a car needs. Our ROI model's hotel example assumes a 12 kWh average session (about 79 minutes on a 40-amp port), a deliberately modest figure; a guest who arrives with a low battery and plugs in overnight can take far more, so your own sessions may run larger. DC fast charging rarely makes sense for a hotel that sells beds, because the guest is not waiting in the lot.
- Start small, wire for more. Our rules of thumb suggest installing chargers at 10 to 20 percent of spaces and building infrastructure for 25 to 40 percent. Given the revenue benchmark above, treat the low end as a ceiling for a hotel without strong corridor traffic, and run conduit and panel capacity for the rest so adding ports later costs a fraction of retrofitting.
- Put them where guests can find them. Ports near the entrance or in a camera-covered area help; ports at the far end of a dark lot get less use and more vandalism. Cable theft is a real risk, covered in how to prevent EV charging cable theft.
- Plan for connectors. Level 2 ports with a J1772 connector serve most non-Tesla cars, and Tesla drivers can use a J1772 adapter that many carry. Mixed connector fleets are changing; see our Tesla and NACS coverage for commercial sites.
- Accessibility is not optional. Spaces and routes must meet accessibility rules; the details are in ADA requirements for EV charging.
Pricing and parking rules that avoid problems
Hotels price charging three ways, and we could not find a systematic survey of which is most common: free to guests, a per-kWh rate, or a flat overnight fee. Anecdotal consumer guides report everything from free for loyalty members to $0.50 per kWh. Our ROI article's guidance still holds: many hotels use a $10 to $25 flat overnight fee, which prices a full overnight charge above $0.50 per kWh for a typical session.
Whichever you choose, set the rules in writing:
- Who may charge: overnight guests only, or restaurant and event visitors too.
- Idle and overstay fees: a car that finishes charging at 2 a.m. and sits until noon blocks the port. An idle fee or a "move your car" text is a common fix.
- Gasoline-car blocking: signage and enforcement matter more than most operators expect.
- Billing: a flat fee is simplest at check-in; per-kWh billing needs a network and a payment method. Our pricing guide walks through the tradeoffs.
How to model your own property
Open the commercial ROI snapshot and enter hospitality-realistic assumptions rather than generic retail ones: a small port count, an overnight-heavy session length, low early-year occupancy (3 percent is a defensible Year 1), and your own price. Then run a second case in which the booking effect is zero. If the project only works with a large guessed room-night lift, that is information too.
What we are not sure about
The vendor benchmark is the only per-site hotel revenue figure we found, and we could not confirm it against the original report. The J.D. Power usage figure is from 2023 and we found no newer edition. Hotel charging pricing practice has no systematic survey that we could find. If you operate hotel chargers and can share anonymized utilization and revenue, that would improve this piece.
Last factually verified: October 23, 2026. Sources: J.D. Power 2023 North America Third-Party Hotel Management Guest Satisfaction Benchmark (as reported by Hotel Dive and Lodging Magazine); Boutique and Luxury Lodging Association and El-Monde survey release of April 17, 2025 (via search excerpts and secondary coverage; the release page was unreachable); EV Connect hotel benchmarks (secondary reprints); NREL EV WATTS figures and the installed-cost and payback examples from our own ROI model. Unreachable from this environment: hospitalitynet.org and costar.com (DNS failure), so the survey details and CoStar's reporting on hotel charging were confirmed from search excerpts only.
evcharginghelp.com is editorially independent and receives no compensation from any company mentioned.