The public record of what charging networks pay landowners is thin and mostly municipal: $15 to $25 a month per station in one Minnesota offer, the greater of $3,500 a year or 2.5% of electricity revenue in a Maryland county proposal, $2,600 per space per year in one California town's retired deal. We found no US market survey, so this article reads those documents, shows which clauses can matter as much as the rent, and gives a way to price an offer against what the same stalls earn today.

By EV Charging Help editorial teamFor commercialNov 17, 2026
On this page

If a charging network has sent you a cold offer for part of your parking lot, the rent is the number you will be shown first and the easiest one to compare. The public documents we could read put it anywhere from $15 a month per station to a few thousand dollars per stall per year. The clauses around the rent (who can renew, who can walk away, who pays to remove the equipment, what happens when you sell) can matter as much, and a few of them carry a price tag the rent never will.

We found no US market survey of land-lease rates for EV charging. The figures that circulate tend to be single deals reported secondhand or illustrative numbers. What does exist is public paper: city and county council packets that describe proposed terms. That is the evidence here. It skews toward public landowners, small sites, and early drafts, so treat it as worked examples of how deals are built, not a price list for your lot.

This article covers a network or operator that leases or licenses your land and owns the equipment. If you own the chargers, or co-fund them and share revenue, see Charging-as-a-Service contract terms and Own, Turnkey, or Hybrid.

A note on words. The documents below mix leases and licenses. Generally, a lease hands over a right to possess the space, while a license is permission to use it, and the difference can change how a lender, an existing tenant, or a court treats the deal. We are not lawyers; ask yours which one you are being offered. Montgomery County, San Francisco, and Chehalis are leases. Saint Anthony Village, Sebastopol, Novi, and Truckee are licenses.

What the public documents show

$15 to $25 a month per station, plus a utilization bonus (Saint Anthony Village, Minnesota, 2022). A network's offer to this suburb priced the license at $15 a month per Level 2 station and $25 a month per 50 kW DC fast station, with the network paying maintenance and electricity. An annual bonus of $15 (Level 2) or $25 (DC fast) per percentage point of average utilization above a 5% threshold sat on top. The offer's example: a 50 kW station at 20% average utilization earns a $375 bonus, plus $300 a year in fixed fees, so $675 a year (our arithmetic). The offer does not define utilization (by time plugged in, or by energy delivered), and that definition decides the bonus. The offer's 20-year pro forma for nine stations (six Level 2, three DC fast) totals $89,100, but it assumes 20% utilization at every station for the full 20 years, and the draft agreement gives only a 10-year term, with the two five-year extensions subject to mutual agreement. The guaranteed part is the fixed fee: $180 a year per Level 2 station and $300 per DC fast station (our arithmetic). The nine stations sit on 18 charging spaces, so per space the figures are about half of the per-station ones. Also note the wording: the draft pays the bonus for stations at "6% or greater" utilization while its own table keeps the 5% threshold, so a station at 5.5% is ambiguous. The draft was unsigned and dated only "2022"; we did not confirm what the city signed.

The greater of a floor or a percentage (Montgomery County, Maryland, 2025). The county executive proposed a 10-year lease to Francis Energy for DC fast charging on 26 parking spaces in two county lots (12 and 14 spaces), with an option to renew for five more years. The county would receive the greater of $3,500 per year or 2.5% of gross revenue from electricity sales. The papers do not say whether the $3,500 floor applies per lot or across both, or who holds the renewal option. The percentage only overtakes the floor once electricity sales pass $140,000 a year (our arithmetic: $3,500 divided by 0.025), and "gross revenue from the sale of electricity" does not obviously reach parking, idle, or subscription fees, credits, or grants, so a real deal needs that definition and a right to audit. The county also proposed a right to terminate on 30 days' notice. Be careful borrowing that: the sites are public lots the county calls underutilized, the project follows the federal NEVI program's requirements, and a private operator that has to finance equipment will price a short-notice exit or refuse it. We read the executive's proposal and the council briefing; we did not confirm the final signed lease.

Per-space rent set against parking revenue (Truckee, California). The town's original 2018 deal with ChargePoint charged $2,600 per space per year with a 4% annual increase, for six spaces: $15,600 in the first year. Town staff explained that the rent assumed each EV space would be occupied 100% of the time as a paid parking space, since a non-EV car cannot use it, while average occupancy in the town's Value Lots was about 36%. The chargers are in the Railyard Lot, so that 36% may not describe those exact stalls. In March 2026 staff recommended dropping the fixed fee for the successor operator, calling it cost prohibitive and a driver of higher charging prices, and instead charging drivers the normal hourly parking rate. That is a staff recommendation in a council packet; we did not confirm the vote.

An asking rent in a city solicitation (San Francisco, 2021). A regional peer-agency study summarizing the transit agency's request for proposals described a nine-year lease at a base rent "starting at" $250 per stall per month and rising to $500 over the term, plus a percentage of gross monthly revenue by tier. It is a 2021 solicitation as summarized by a third party, not an awarded contract, and it covers existing city lots and garages, mostly for Level 2 charging.

A per-kWh share for a small Level 2 site (Novi, Michigan, 2023). For two Level 2 chargers at a library, the operator would share $0.03 per kWh with the city, rising to $0.05 per kWh after renewal, with driver prices capped at 150% of the delivered power cost. The structure is the point: a per-kWh share pays you only when cars charge.

No rent at all (Sebastopol, California, 2022). A network proposed four DC fast chargers in a downtown lot, with the utility funding the electrical make-ready work. Staff described the project as at no cost to the city, and the agreement we read contains no license fee. A landowner can end up hosting for free in exchange for the amenity, which is a trade you should make on purpose.

A city lot for a truck site (Chehalis, Washington, 2026). EVwire reported on September 10, 2026 that Tesla signed a lease with the City of Chehalis for a Semi charging site: $1,250 a month plus leasehold excise tax, a 10% increase every fifth anniversary, a renegotiation clause every 20 years, a 10-year base term with four five-year renewal options, and up to eight truck stalls on about 32,000 square feet. Rent starts only after up to 365 days of due diligence and then up to another 365 days, so it could be two years before the first payment. At eight stalls the rent is about $156 per stall per month, and at four about $313 (our division), but the rent also covers a small amenity building and equipment area, and the site is built for heavy trucks, not cars. We read EVwire's account, which cites a lease document shared on social media; we did not find the lease in the city's own records, so treat the terms as reported.

None of these is a market rate for a retail parking lot or a convenience store, and a site beside a busy highway exit is not a municipal library lot. Do not read a rent from this list as what your site is worth.

The clauses that move the value

Term, and who holds the renewal. Saint Anthony Village's draft and Sebastopol's agreement both run 10 years from the day the chargers open, with two five-year extensions. They differ on who decides. The Sebastopol agreement lets the operator extend by giving notice within 180 days of the end of the term; the Saint Anthony Village draft says the extensions happen "if agreed to mutually." That one phrase decides whether you can be held for 20 years. Novi has one five-year renewal by mutual election, then further renewals by agreement.

Exit costs often run one way. The Novi proposal lets the operator leave if the chargers average under 50 kWh a month for six consecutive months after month 36, on 60 days' notice. If the city ends the agreement without cause before month 120, it must reimburse the operator's rebates and installation costs, pay to remove the equipment, and pay 50% of average monthly gross sales for the rest of the term. The same document says that if the city sells or transfers the property, it must either assign the agreement to the buyer or terminate under that same section, so a sale can trigger the payment. Price your exit in year five, and in the year you might sell.

Free options for the operator before it builds. Under the Sebastopol and Saint Anthony Village documents, the operator may terminate on 30 days' notice before the chargers open, or change the number and type of stations, while the host's right to terminate for a missed opening date (24 months in Sebastopol) ends once construction begins. Rent in these documents starts when the station is operating, so a signed agreement can tie up your stalls and pay nothing for a long time. The Chehalis report shows the same pattern. Ask for an opening deadline with a real remedy, such as a termination right or a start of rent on a fixed date.

Exclusivity. The Novi proposal grants the operator exclusive EV charging rights across the whole parcel, not just the leased stalls. That can block a future tenant, a second network, or your own chargers. Ask for the smallest radius that makes commercial sense, and for it to lapse if the operator misses an uptime or opening deadline.

Utilities, and what stays behind. In the Sebastopol packet the operator removes its equipment at the end and restores the area, except that underground wiring is capped and left in place and the utility's own transformers, boxes, cable, conduit, and meters stay. No deadline beyond "within a reasonable time" and no removal bond appears. The Novi document puts removal and restoration on the operator. The Sebastopol packet also has the host acknowledge the utility's rights to build, maintain, and remove its infrastructure on the site, with access, a five-foot no-building zone around it, and a utility right to disconnect service if access is blocked; the Saint Anthony Village draft obliges the host to grant utility easements. Ask where the utility's equipment will sit, how much of your land it freezes, and what happens if you want to build there.

Host-side costs and obligations. The Sebastopol and Saint Anthony Village documents have the host paying for lot upkeep (sweeping, snow removal, repaving, restriping) in the licensed space, and the Sebastopol agreement passes any property-tax increase caused by the improvements to the host. The Saint Anthony Village draft also requires the host to insure the charging infrastructure at full replacement cost and carry $2 million in general liability coverage, and it limits each side's total liability to the greater of $1.5 million or the required insurance. It lets the operator assign the agreement to an affiliate or successor without consent. Sub-metering through your meter reimburses at "the applicable per kWh rate," which may not cover demand charges; see pricing your charging. Under Sebastopol the operator keeps the incentives and rebates.

Reporting and audit. The Novi proposal requires quarterly statements. The Saint Anthony Village draft, which pays a bonus based on utilization, contains no audit or reporting right we could find. If your pay depends on their numbers, ask for the data.

The operator's right to change equipment. The Sebastopol agreement lets the operator upgrade, revise, or swap stations at its sole discretion, and the Saint Anthony Village draft lets it remove all or part of the stations at any time, with the fee per installed station. A fee that shrinks when they remove equipment is not a floor.

Parking count and consents. Chargers take stalls out of ordinary use. The Sebastopol agreement has the host warrant that lender, tenant, and easement-holder consents are in hand. Check your existing leases for parking-ratio or exclusive-use clauses, your loan documents, and your zoning for minimum parking counts, before you promise the stalls. We found no general rule; it is local and lease-specific.

Rent escalators. Truckee's 4% annual increase on a rent priced at 100% occupancy is the example of an escalator that outran what the stalls could support. Chehalis reports 10% every fifth year. Tie the escalator to something real, such as parking rates or utilization, instead of a fixed percentage on a number that was already too high.

How to price an offer against your own lot

This is our adaptation of the reasoning in the Truckee staff report: compare the offer with what the same stalls earn for you today.

  1. Count every square foot the deal takes, including aisles, the equipment pad, cabinets, and any utility no-build zone, not just the charging bays.
  2. Find what each stall can earn. Take the stall's revenue at full occupancy (your rent or parking rate times the hours it can be used), then apply a realistic occupancy. Truckee's $2,600 was the 100% figure; at the 36% occupancy it reported for its Value Lots, the same stall earns about $936 a year (our arithmetic: $2,600 times 0.36). If your lot's parking is free today, the stall's current value may be near zero, but the amenity and any lost flexibility still have a price.
  3. Add the cost to you. Legal review, insurance, upkeep, lost flexibility, and restoration risk if the operator fails. If you carry the electric bill or any demand charge, price that too.
  4. Compare the guaranteed floor, not the projection. In Saint Anthony Village's offer, the guaranteed fee was $300 a year per fast charger and the rest depended on utilization above a threshold. If the floor is below the stall's value, the gap is what you are betting on their traffic to fill.
  5. Compare the alternatives. Buying and hosting the equipment yourself, as in Tesla's Supercharger for Business, puts the equipment cost and risk on you. Our property-fit guide covers which site types suit charging at all.

When to say no

  • The rent is below what the stalls earn now and there is no revenue share or minimum that closes the gap.
  • The operator holds a one-way renewal option and you have no exit short of a large penalty, or a sale of your property triggers one.
  • Exclusivity covers the whole parcel and has no deadline or performance condition.
  • There is no opening deadline, or the deadline has no remedy.
  • The agreement is silent on who removes the equipment, when, and what secures that promise, or on what happens if the company is sold or fails. For what that looks like in practice, see the Ample collapse.
  • Your pay depends on utilization or revenue figures you cannot audit.
  • You are being asked to sign quickly. The RFP checklist works as a list of questions for any network, not just for a bid.

Have a real estate attorney who has reviewed commercial parking or ground leases read the agreement, not the network's summary. The documents above are public examples; yours will differ.


Last factually verified: November 17, 2026, by opening each source directly: the Carbon Solutions Group (CSG) Electric Vehicle Charging Station Offer to Saint Anthony Village, Minnesota, dated April 11, 2022, and the draft CSG EV, LLC Electric Vehicle Charging Station License Agreement in the same city council agenda item (license fees of $15 per Level 2 and $25 per 50 kW DC fast station per month; the offer's 5% utilization threshold, $375 example, nine stations on 18 spaces, and $89,100 20-year pro forma at an assumed 20% utilization; the draft's "6% or greater" trigger, mutual extensions, host insurance, liability cap, assignment, and no audit right); Montgomery County, Maryland Council Agenda Item 6 of September 9, 2025 (Executive Order 130-25 and the material terms memo dated June 26, 2025: 10-year lease with one five-year renewal option, greater of $3,500 per year or 2.5% of gross electricity revenue, county termination on 30 days' notice, 12 and 14 spaces, NEVI requirements); the Town of Truckee, California staff report to Town Council dated March 24, 2026 ($2,600 per space per year with a 4% annual increase, $15,600 first-year revenue for six spaces, about 36% occupancy in the Value Lots, staff recommendation to eliminate the fixed fee); the City of Sebastopol, California council packet of November 15, 2022 (CSG Burnett Street agreement and utility site acknowledgement: 10-year term, two five-year extensions at the operator's option within 180 days of the end of the term, 24-month host termination right before construction, equipment swap, removal, host cost, tax, and consent terms; no license fee found); the City of Novi, Michigan council packet of October 9, 2023 (Charge EV, LLC license: $0.03 per kWh rising to $0.05 per kWh after renewal, 150% price cap, 10-year term with a five-year renewal, parcel-wide exclusivity, the 50 kWh per month operator exit, the host early-termination and sale provisions, quarterly statements); and the SANDAG Regional EV Charger Management Strategy peer agency research (November 1, 2021), which summarizes a San Francisco Municipal Transportation Agency 2021 request for proposals (nine-year lease, base rent from $250 to $500 per stall per month, plus percentage rent; secondary summary). The Chehalis, Washington lease terms are from EVwire's September 10, 2026 report, a secondary source; the lease itself was not found in the city's records and was not read. The Tigard, Oregon agenda item and a Chehalis newspaper report could not be reached from our research network and are not used. We could not confirm the final executed version of any agreement described here: Saint Anthony Village and Sebastopol are unsigned drafts, Novi's packet leaves the final form to the city attorney and manager, and Montgomery County and Truckee are proposals. All figures marked "our arithmetic" or "our division" are simple multiplication or division of the quoted figures. The count of primary sources in the frontmatter excludes the two secondary sources.

evcharginghelp.com is editorially independent and receives no compensation from any company mentioned.

Sources & verificationLast verified Nov 17, 2026

This article draws on 6 primary sources, cited inline where each figure appears. We re-check the numbers when incentive amounts, regulations, or product availability change.

Last updated Nov 17, 2026

ShareLinkedInXEmail
Keep reading
For commercial

Insurance for Commercial EV Charging

Standard commercial property and liability policies were not written for EV charging. Property owners who host chargers take on fire, environmental, cyber, and theft exposures that often fall through coverage gaps, and the operating model they pick decides how much of that risk stays with them.

Updated Oct 202622 min read
For commercial

ADA Requirements for EV Charging Stations

There is no EV-specific federal accessibility standard in force. Commercial EV charging must comply with the 2010 ADA Standards as applied to fixed elements, operable parts, and accessible routes. The U.S. Access Board published proposed EV-specific guidelines (NPRM, September 2024), but it moved that rulemaking to inactive status on September 4, 2025, so no EVSE-specific federal scoping rule is in force. This article separates what current law requires, what the Access Board recommends as nonbinding technical assistance, and what the inactive proposal contained.

Updated Oct 202610 min read
For commercial

Adding NACS Connectors to Existing CCS Chargers: A Site Host's Decision Guide

If you own CCS-only DC fast chargers, the realistic way to add NACS is to swap a cable or a cabinet on some stalls, not to rebuild the site. Whether a swap is available depends on the charger model: ChargePoint says most of its stations have modular cables, and InCharge sells a cable-swap kit for two of its own charger lines. No vendor we found publishes a price, so budget from a written quote. Keep CCS on enough stalls to serve the installed base and to satisfy funding rules: federal NEVI rules require at least one permanently attached CCS1 connector per fast-charging port, and California's CALeVIP Window 2 requires at least half of a site's ports to be CCS and does not fund replacement installations. What happens to a charger's safety listing when a connector is changed is a question for the manufacturer in writing, because we found no primary source that answers it.

Updated Nov 202610 min read

Want the complete commercial guide?

The Commercial Charging Playbook covers evaluating, planning, and operating EV charging, including the funding programs that can cover most of the cost.

The Weekly EV Charging Briefing

One email a week. Just EV news that matters.

By subscribing you agree to our Privacy Policy. Unsubscribe any time.